Mon to Fri, 9:00 to 18:00 ESTBid-week cover outside these hours by arrangementUnited States & United Kingdom(929) 654-0076quantx.estimation@gmail.com
QuantXEstimationRequest a Quote

Real packages. Client names deliberately absent.

Every example below is anonymised: no client names, no project numbers, no drawing extracts, because that is exactly the treatment your project will get. If you want attributed references, ask and we will arrange them directly with clients who have agreed.

Selected engagements

Twelve packages across four sectors and two markets.

Filter by sector. Each card states what was measured and what the client got out of the way it was structured.

US · California

Single-family residence, full build

15 divisions3,180 sq ftComplete estimate

Complete build estimate across fifteen active divisions, from strip footings and slab through framing, roofing, finishes, plumbing, HVAC, electrical and exterior improvements. Every line carried its own production rate and wastage factor.

10,963 labour hours priced item by item, not by allowance
UK · London

Residential conversion, South-East London

UK ratesMetricConversion

Conversion of an existing property into self-contained units. Priced in metric with UK labour rates and British conventions, delivered in GBP rather than a US template with a currency conversion applied at the end.

Issued in the client’s own cost template
US · Florida

Residential electrical, new construction

Division 26Single trade70 devices

Service, panel schedule, branch circuits, device counts, fixtures and low-voltage rough. Every device covered by a colour bubble on the reflected ceiling plan, with counts carried into a legend the installer used at rough-in.

Device counts reconciled against the fixture schedule before release
US · Texas

K–12 elementary school, metals & electrical

Division 05Division 26Two packages

Structural and miscellaneous metals alongside a complete electrical takeoff for a public elementary school, produced for a subcontractor bidding both packages against the same deadline.

Two packages submitted on one bid date from a single marked set
US · Georgia

Commercial transfer station

Multi-divisionHeavy structureSite interface

Waste transfer facility combining heavy slab and retaining structures, a steel enclosure, tipping floor and the site interface. The boundary between building and sitework scope had to be defined before anything could be measured.

Building and sitework boundary written into the scope statement
UK · London

Mixed-use development, central London

UKMulti-blockDeveloper

Estimating support for a London developer across a multi-block mixed-use scheme, with cost information structured for their internal reporting rather than an imported American format.

Reported in the client’s own elemental breakdown
US · Oregon

Structural steel for a fabricator

Division 05FabricationTonnage + connections

Ongoing steel takeoffs measured by member and connection type, so tonnage, shop hours and field bolt-up could be priced independently against a shop rate that moved through the year.

Shop rate changed without rebuilding a single estimate
US · Multi-state

Process piping & plant MEP

Division 40ProcessMulti-spec

Piping measured line by line against specification and service rather than aggregated by diameter, with valves, fittings, supports and specialty items counted individually and priced apart from installation hours.

Material spec changes repriced without re-measuring
US · Industrial

Equipment foundations & setting

Division 03EquipmentAnchors

Reinforced equipment pads, anchor bolt assemblies and setting labour for a production facility, with the productivity loss of working inside a partially operating plant priced explicitly.

Live-plant productivity factor written into the assumptions
US · Florida

Heavy civil roadway corridor

RoadwayGC takeoffBy station

Corridor improvement takeoff covering roadway sections, subgrade preparation, base course, asphalt tonnage, curbing, drainage structures and striping, measured section by section.

Quantities segmented by station for phased pricing
US · Florida

Electrical site power distribution

Division 26UndergroundSite-wide

Site-wide power distribution covering underground duct bank, feeders, transformer pads, site lighting and terminations, with conduit and conductor split by run for direct comparison against vendor quotes.

Conduit and conductor separated for direct vendor pricing
US · Sitework

Land clearing & earthwork balance

Division 31Cut / fillHaul

Clearing, grubbing and mass earthwork for an excavation contractor, with volumes calculated using swell and shrink by material type and haul priced against a stated disposal distance.

Unsuitable material flagged rather than absorbed into the rate
US · California

Single-family residence, full build

15 divisions3,180 sq ftComplete estimate

Complete build estimate across fifteen active divisions, from strip footings and slab through framing, roofing, finishes, plumbing, HVAC, electrical and exterior improvements. Every line carried its own production rate and wastage factor.

10,963 labour hours priced item by item, not by allowance
UK · London

Residential conversion, South-East London

UK ratesMetricConversion

Conversion of an existing property into self-contained units. Priced in metric with UK labour rates and British conventions, delivered in GBP rather than a US template with a currency conversion applied at the end.

Issued in the client’s own cost template
US · Florida

Residential electrical, new construction

Division 26Single trade70 devices

Service, panel schedule, branch circuits, device counts, fixtures and low-voltage rough. Every device covered by a colour bubble on the reflected ceiling plan, with counts carried into a legend the installer used at rough-in.

Device counts reconciled against the fixture schedule before release
US · Texas

K–12 elementary school, metals & electrical

Division 05Division 26Two packages

Structural and miscellaneous metals alongside a complete electrical takeoff for a public elementary school, produced for a subcontractor bidding both packages against the same deadline.

Two packages submitted on one bid date from a single marked set
US · Georgia

Commercial transfer station

Multi-divisionHeavy structureSite interface

Waste transfer facility combining heavy slab and retaining structures, a steel enclosure, tipping floor and the site interface. The boundary between building and sitework scope had to be defined before anything could be measured.

Building and sitework boundary written into the scope statement
UK · London

Mixed-use development, central London

UKMulti-blockDeveloper

Estimating support for a London developer across a multi-block mixed-use scheme, with cost information structured for their internal reporting rather than an imported American format.

Reported in the client’s own elemental breakdown
US · Oregon

Structural steel for a fabricator

Division 05FabricationTonnage + connections

Ongoing steel takeoffs measured by member and connection type, so tonnage, shop hours and field bolt-up could be priced independently against a shop rate that moved through the year.

Shop rate changed without rebuilding a single estimate
US · Multi-state

Process piping & plant MEP

Division 40ProcessMulti-spec

Piping measured line by line against specification and service rather than aggregated by diameter, with valves, fittings, supports and specialty items counted individually and priced apart from installation hours.

Material spec changes repriced without re-measuring
US · Industrial

Equipment foundations & setting

Division 03EquipmentAnchors

Reinforced equipment pads, anchor bolt assemblies and setting labour for a production facility, with the productivity loss of working inside a partially operating plant priced explicitly.

Live-plant productivity factor written into the assumptions
US · Florida

Heavy civil roadway corridor

RoadwayGC takeoffBy station

Corridor improvement takeoff covering roadway sections, subgrade preparation, base course, asphalt tonnage, curbing, drainage structures and striping, measured section by section.

Quantities segmented by station for phased pricing
US · Florida

Electrical site power distribution

Division 26UndergroundSite-wide

Site-wide power distribution covering underground duct bank, feeders, transformer pads, site lighting and terminations, with conduit and conductor split by run for direct comparison against vendor quotes.

Conduit and conductor separated for direct vendor pricing
US · Sitework

Land clearing & earthwork balance

Division 31Cut / fillHaul

Clearing, grubbing and mass earthwork for an excavation contractor, with volumes calculated using swell and shrink by material type and haul priced against a stated disposal distance.

Unsuitable material flagged rather than absorbed into the rate

Why there are no client names on this page

Because we did not ask for permission to publish them, and publishing without asking is the fastest way to prove you cannot be trusted with a drawing set. Bid strategy, quantities and pricing are commercially sensitive; a competitor learning who prices your work, and on what, is a real disadvantage to you.

If a client is happy to be named, we say so with their written approval. Everything else stays exactly as anonymous as it is here. We will sign your NDA before opening your set if you have one.

Your project would sit somewhere on this page.

Unnamed, undated and undescribed, right up until you tell us otherwise. Send the drawings and we will tell you the fee and the date.