Mon to Fri, 9:00 to 18:00 ESTBid-week cover outside these hours by arrangementUnited States & United Kingdom(929) 654-0076quantx.estimation@gmail.com
QuantXEstimationRequest a Quote
CSI Division 09 · Finishes

Flooring & tile estimating services

Measured room by room against the finish schedule, with underlayment, transitions, base and setting materials counted as their own lines.

How we measure it

What a flooring & tile package looks like.

Flooring is the clearest case for measuring by room rather than by building. The finish schedule assigns different products to different spaces, and a single blended rate across the floor plate hides both the expensive rooms and the cheap ones.

Each room is measured to its own product, then underlayment, levelling compound, membrane, adhesive, grout, transitions and base are added by area and linear foot. Pattern, tile size and layout direction drive wastage, so wastage is set per product rather than globally.

Measured in

SFLFEA

What we look for specifically

  • One product rate applied across the whole floor plate
  • Wet-area membrane missed under tile
  • Pattern and tile size ignored when setting wastage
  • Base and transitions left out of the package
Typical scope coverage

Flooring & tile

  • Floor areas by room and product from the finish schedule
  • Tile by size and pattern with layout wastage
  • LVT, vinyl and resilient sheet by area
  • Carpet and carpet tile with roll or box yields
  • Hardwood and engineered timber
  • Underlayment, levelling and moisture mitigation
  • Crack isolation and waterproofing membrane in wet areas
  • Setting materials, adhesive and grout
  • Base, skirting, cove and trim by linear foot
  • Transitions, thresholds and edge profiles
  • Wall tile in wet areas by area and height

Turnaround

24 hours on most flooring packages

Who it is for

Flooring and tile subcontractors, interior fit-out contractors, home builders and general contractors.

What you receive

Every flooring & tile package ships the same four things.

Whatever the trade, the deliverable is consistent, so a package from us always drops into how you already work.

Excel workbook

Line-item detail with quantities, wastage, labour hours and material priced on separate columns.

Colour-marked sheets

Every measured item marked on the drawing with a count legend, so any figure can be checked against the plan.

Assumptions & exclusions

Written down, including anything the drawings did not answer, rather than absorbed into a rate.

Planswift source file

On request, so your team can re-measure a revision without coming back to us.

Flooring & tile questions

Common questions on flooring & tile takeoffs.

Yes, against the finish schedule, so each space carries its specified product. Averaging across a floor plate is the single most common source of error in a flooring package.

Per product and pattern. A straight-lay 12×24 tile and a herringbone mosaic do not waste at the same rate, and diagonal layouts carry more again. Each carries its own percentage in its own column.

Send us one flooring & tile package.

A fixed fee, a firm delivery date and a written scope statement, usually back the same working day. Judge us on the file that comes back.