Early stage · 1–3 working days

Budget & conceptual estimating services

Order-of-magnitude and conceptual pricing from schematics, sketches or a written scope, for decisions taken before design is finished.

What it is

What budget & conceptual estimating covers

Early-stage numbers exist to answer a go or no-go question, secure funding or set a client expectation. They are built from square-foot and elemental models benchmarked against comparable completed work, not from a full measurement that the drawings cannot yet support.

The accuracy expectation for the design stage is always stated. Presenting a schematic-stage figure with the confidence of a construction-document estimate is how budgets get set badly, and it is the fastest way to lose a client relationship six months later.

Turnaround

1–3 working days

Who it is for

Developers, owners, architects and contractors taking feasibility or funding decisions.

What is included

Budget & conceptual estimating

  • Square-foot and elemental cost models
  • Benchmarking against comparable completed projects
  • Allowances stated openly rather than buried in rates
  • Design-development updates as drawings mature
  • Accuracy expectation stated for the design stage
  • Escalation and contingency guidance
What you receive

The deliverable.

Consistent whatever the engagement, so it drops into how you already work.

Elemental or square-foot budget workbook

Basis-of-estimate note covering what is included and assumed

Comparison against benchmark projects where relevant

What goes wrong

Common budget & conceptual estimating mistakes

These are the errors that turn up most often when work of this kind is checked. None of them are exotic, and all of them are cheaper to find before the number goes out than after.

For a longer list with examples, read nine takeoff mistakes that only show up on bid day.

Watch for
  • A concept-stage figure presented with the confidence of a bid, and later quoted as a commitment
  • Allowances buried inside rates, so nobody can see how much of the budget is a placeholder
  • Benchmarks taken from a different building type, location or specification without adjustment
  • Today’s prices used for a project that will not start for eighteen months
Questions

Common questions on budget & conceptual estimating

It depends entirely on how much design exists, which is why the expectation is stated on the document rather than implied. A concept-stage figure and a design-development figure are different products and should not be presented with the same confidence.

Yes. The less drawing information there is, the more the number depends on stated assumptions, and those assumptions are written down where you can see and challenge them.

Keep going

By trade, by sector, and further reading

Estimating by sector

Tell us what you need priced.

A fixed fee, a firm delivery date and a written scope statement, usually back the same working day.