Budget & preliminary estimating services
Order-of-magnitude and conceptual pricing from schematics, sketches or a written scope, for decisions taken before design is finished.
Budget & conceptual estimating
Early-stage numbers exist to answer a go or no-go question, secure funding or set a client expectation. They are built from square-foot and elemental models benchmarked against comparable completed work, not from a full measurement that the drawings cannot yet support.
The accuracy expectation for the design stage is always stated. Presenting a schematic-stage figure with the confidence of a construction-document estimate is how budgets get set badly, and it is the fastest way to lose a client relationship six months later.
Turnaround
1–3 working days
Who it is for
Developers, owners, architects and contractors taking feasibility or funding decisions.
Budget & conceptual estimating
- Square-foot and elemental cost models
- Benchmarking against comparable completed projects
- Allowances stated openly rather than buried in rates
- Design-development updates as drawings mature
- Accuracy expectation stated for the design stage
- Escalation and contingency guidance
The deliverable.
Consistent whatever the engagement, so it drops into how you already work.
Elemental or square-foot budget workbook
Basis-of-estimate note covering what is included and assumed
Comparison against benchmark projects where relevant
Common questions on budget & conceptual estimating.
It depends entirely on how much design exists, which is why the expectation is stated on the document rather than implied. A concept-stage figure and a design-development figure are different products and should not be presented with the same confidence.
Yes. The less drawing information there is, the more the number depends on stated assumptions, and those assumptions are written down where you can see and challenge them.
Work that usually sits alongside this.
Most engagements combine more than one of these.
Tell us what you need priced.
A fixed fee, a firm delivery date and a written scope statement, usually back the same working day.
Fixed project fees · Written scope before work starts · Unlimited revisions within scope


